Sign up for more Information

Bishopthorpe Palace, York

FHP was appointed by The Church Commissioners to carry out the mechanical and electrical design to the refurbishment project at the grade 1 listed Bishopthorpe Palace.

The project involved the replacement of all M&E systems and integration of new technologys into complex listed build.

Services Provided:

  • New gas-fired high efficiency condensing boilers utilising new and existing ornate cast iron radiators.
  • Bespoke design of the new and existing heating system, located in the Chapel floor utilising forced warm air convection technology.
  • New domestic hot and cold water services.  Hot water provided from a gas-fired high efficiency condensing hot water generating unit.
  • Fully integrated building management system controlling the heating and domestic hot water systems.
  • Bespoke design of the new lighting and emergency lighting, taking into account the Grade 1 Listed ornate walls and ceilings.  Feature external lighting
  • Integrated wireless fire alarm system.
  • Passenger lift.
  • Telephone and high speed internal data systems
  • Feature lighting to the building façades