Sign up for more Information

Wolfsen Building – University of Hull

FHP was appointed by Hull University to design and co-ordinate the mechanical and electrical services associated with the fit out of a completely refurbished 5 storey research facility with restricted floor to ceiling heights throughout the building.

Services Provided:

  • Three independent fully air conditioned systems serving research unit facilities located from ground to the fourth floor.
  • Low pressure hot water radiator heating systems serving 5th floor level offices and circulation areas on all levels.
  • Constant temperature heating system serving heater battery units located in air handling equipment and zone reheater units.
  • Chiller and chilled water distribution system serving air cooled coils located in air handling plants and zone cooler units.
  • Domestic hot and cold water distribution systems.
  • Extract air systems, including fume cupboard extract systems.
  • Gas distribution system serving the research units.
  • Fully integrated building management system.
  • Lighting and emergency lighting.
  • Fire alarm system.
  • Mains switchgear and small power.
  • Lighting protection.
  • Passenger lift.
  • High speed telephone and data systems network.