Services: Mechanical, Electrical & Public Health, Sustainability & Building Physics, Digital Engineering
Sector: Leisure
Client: Marshall / CDP
Value: £11m
FHP were appointed by the contractor, to develop the feasibility design of this project to construction stage and further to working drawings.
The Role of FHP
FHP were novated to the contractor to complete the design on behalf of the Design and Build Contractor.
FHP worked closely with the hotel operator to ensure the stringent design criteria was met throughout the design process.