The Role of FHP
FHP carried out the enabling works package and the stage 1-3 design of the MEP services. FHP were retained by the client to oversee the project through the tendering and construction phases.
FHP worked closely with the hotel operator to ensure the stringent design criteria was met throughout the design process.