Premier Inn Headingley

Premier Inn Headingley,

Leeds

Digital Engineering, Mechanical, Electrical & Public Health, Sustainability & Building Physics
Sector:
Leisure
Client:
Schroder
Value:
£4.5m

FHP were appointed by Schroder to develop a feasibility and stage 3 information to enable the client to gain planning permission, cost certainty and have the project tendered.

FHP worked closely with the hotel operator to ensure the stringent design criteria was met throughout the design process.

The Role of FHP

FHP carried out the enabling works package and the stage 1-3 design of the MEP services. FHP were retained by the client to oversee the project through the tendering and construction phases.

FHP worked closely with the hotel operator to ensure the stringent design criteria was met throughout the design process.