Cookies

This site uses cookies that need consent.

Mechanical, Electrical & Public Health

We strive to produce excellent Building Services designs, ensuring the latest use of technology and innovation is utilised whilst working closely with the client and design teams to guarantee true collaboration and cost control.

The full and considered approach to building services within the built environment is at the centre of our collaborative approach and focus to ensure successful project delivery.

We always advocate pushing the limits of engineering to minimise building energy use and environmental impact by ensuring that we are educated and have the finest tools to carry out our role as part of the design team. We incorporate our innovative designs within an all-embracing quality system which ensures both cost and technical monitoring take place which in turn ensures that we provide well designed, cost effective buildings, which provide high quality environments.

Concept Design

RIBA STAGES 0-2:

At Concept stage, FHP work closely with the client to develop the employer’s requirements for the Mechanical, Electrical and Public Health building services including the energy strategy for planning submission.

Developed Design

RIBA STAGE 3:

FHP will develop the MEP strategy further at Stage 3 to quantify all MEP spatial requirements to ensure coordination with architectural and structural elements of the project. This will include, fixing plant room sizes and distribution routes; agreeing treatment zones; providing approximate sizes for ducts, pipes and electrical containment; preparing developed models, sketches and schematics.

The design is taken to a level of engineering that allows the client to take the project to tender and be able to have robust tenders returned.

Technical Design

RIBA STAGE 4:

FHP will produce the various specifications and scope requirements during Stage 4 either engaged Client side or Contractor side. The MEP design will be developed to a robust design standard to allow all performance specified works to be agreed and coordinated in full.  

Using the latest Digital Engineering Software FHP produce detailed and co-ordinated technical drawings and specifications, for tender and design team co-ordination to enable clients to cost and procure a main contractor to undertake the construction work.

Construction

RIBA STAGE 5-6:

Working closely with contractors and specialists, FHP can provide construction status fully dimensioned/coordinated working drawings and have the in-house expertise to produce fabrication/factory drawings for the offsite manufacturing process.

FHP can undertake a watching brief - reporting on installation progress, snagging, commissioning and final sign off of a project.

In Use

RIBA STAGE 7:

FHP can assist clients by studying buildings in use by undertaking post occupancy evaluations and monitoring how the building is used once occupied.

Related Projects

Drapers Yard in Leeds
Drapers Yard Leeds
Asset 2
Westbury Hotel by FHP in London
Westbury Hotel London
Asset 2
Old Kent Road - Gasworks Residential Development - FHP in London
Old Kent Road - Gasworks London
Asset 2
Student living for Wimbledon College of Arts by FHP
Wimbledon College of Arts
Asset 2
Dumaresq Street
Dumaresq Street
Asset 2
Bankside Yards West
Bankside Yards West London
Asset 2
Shorts Gardens mixed use development in Covent Garden, London
Shorts Gardens
Asset 2
Hallsville Quarter Phase 3 Canning Town
Asset 2
M7 Stratford
Asset 2
Mount Pleasant Phases 3 & 4 London
Asset 2
Leeds City College Leeds
Asset 2
Hampton by Hilton & Hilton Garden Inn Manchester Airport
Asset 2
2 New Ludgate
2 New Ludgate
Asset 2
Kings Mill Hospital Sutton in Ashfield
Asset 2
Battersea Power Station London
Asset 2
Brighton Marina Phase 2
Brighton Marina Phase 2 Brighton, East Sussex
Asset 2
1 Lyric Square, Hammersmith, London
One Lyric Square Hammersmith, London
Asset 2
Hackney Phase 1 by FHP, London
Shoreditch Exchange - Hackney Phase 1 Hackney Road, London
Asset 2
Liverpool 1, Town Centre Redevelopment
Liverpool 1, Town Centre Redevelopment Liverpool
Asset 2
The Peninsula Hotel, Mayfair London
The Peninsula Hotel Grosvenor Place, Mayfair, London
Asset 2
60 St Johns Wood, London
60 St Johns Wood London
Asset 2
Premier Inn Halifax
Premier Inn Halifax
Asset 2
Ramada Encore, Gateshead
Ramada Encore Gateshead
Asset 2
Hoyland LIFT
Hoyland LIFT Hoyland
Asset 2
Bank Station, London
Bank Station City of London
Asset 2
Dora House, London
Dora House Later Living Lodge Road, London
Asset 2
The Denizen, London
The Denizen The Barbican
Asset 2
St Dunstans House Exterior 1
St Dunstan's House Westminster, London
Asset 2
Duke Of York Public House
Duke of York Public House Victoria, London
Asset 2
Southall Waterside Southall, London
Asset 2
Woodberry Down Hartingtons
Woodberry Down North London
Asset 2
Islington Square, Penthouse Apartment Balcony View
Islington Square Islington, London
Asset 2
One Aire Street Leeds
Asset 2
FHP Crescent House Galliard Homes
Crescent House Clapham, London
Asset 2
67 The Avenue Queens Park, London
The Avenue Brent, London
Asset 2
Bream Street by FHP
Bream Street Fish Island, East London
Asset 2
FHP Battersea Park East, London
Battersea Park East Battersea, London
Asset 2
The Compton, mixed use scheme by FHP in London
The Compton Lodge Road
Asset 2
Premier Inn Headingley
Premier Inn Headingley Leeds
Asset 2
The Mint Leeds
The Mint
Asset 2
Plaistow Hub
Plaistow Hub East London
Asset 2
City Exchange
City Exchange Leeds
Asset 2
City Tower
City Tower Manchester
Asset 2
John Dalton Tower
John Dalton Tower Manchester
Asset 2
Leeds College of Building
Leeds College of Building Leeds
Asset 2
Doncaster LIFT
Doncaster LIFT Doncaster
Asset 2
Hampton by Hilton, Leeds
Hampton by Hilton Leeds
Asset 2